Projects

Restoration, Mitigation and Erosion Control Projects

Lower Sulphur Creek Emergency Streambank Stabilization 1997
Sulphur Creek Watershed Analysis 1998
Sulphur Creek CRMP 1999
Sulphur Creek Sandbar Project 1999
Turtle Bay Pedestrian Bridge Riparian Habitat Mitigation 2000
Beltline Crossing Removal at “Secret Canyon” 2000-2001
Sulphur Creek Realignment 2001-present
Old Route 99 Road to Trail Sediment Reduction Project 2002-2003
Dana Drive Riparian Habitat Mitigation 2003-present
Hilltop Burn Dump Revegetation Project 2003-2004
Highway 299 Riparian Habitat Mitigation  
Sulphur Creek Phase III - Middle Reach Erosion Control and Habitat Enhancement Project 2005-present
Whiskeytown Reservoir Shoreline Erosion Control Project  
Pedestrian Bridge Erosion Control Plan  
Arboretum Perimeter Trail Erosion Control  
Latour State Demonstration Forest Watershed Analysis  

Cleanups

Old 99 Clean-A-Thon

Reports

Development of the Sulphur Creek Watershed Analysis and Action Plan